A change order is a brief document that shows what was stated in the contract relative to the change and describes the change in detail (including specific materials, quality, color or other changes). It should then specify how the change will affect the quality, the schedule and the cost of the project. There should be a place for the homeowner and the contractor to sign and date the change order. Both the contractor and the homeowner should keep a copy of all change orders with the contract.